Assets / Chiller
CH-3 — 300 TR Screw, water-cooled
Status
RUN
71% load
kW/TR
1.50
commissioning 0.85
COP
2.4
Cond. approach
4.8 °C
baseline 1.5
Run hours
44,890
6,018 starts
Next service
OVERDUE
last 2026-03-20
Condenser approach — 30 d°C · daily median at run
Range
Approach has tripled in 30 days at constant wet-bulb — signature of condenser tube fouling. Finding F-2607 open, ₹ 6,100/day penalty.
Live readings30 s sampling
| CHW supply / return | 9.9 °C / 14.3 °C |
| Evap approach | 1.1 °C |
| CDW in / out | 33.2 °C / 39.4 °C |
| Input power | 320 kW |
| Energy meter | EM_12 — OK |
| Trip status | 1 TRIP TODAY (auto-reset) |
Open findings on this asset
F-2607 · CH-3 approach temperature highPart-load curve — measured vs commissioningkW/TR vs % load
Measured 90 dCommissioning
Maintenance & nameplatefrom CMMS
| Type | Screw, water-cooled |
| Capacity | 300 TR |
| Refrigerant | R-134a |
| Commissioned | 2013 |
| Commissioning kW/TR | 0.85 |
| Last service | 2026-03-20 |
| Next service | OVERDUE |
| Open work orders | WO-1187 — condenser descale (approved) |