Chiller set temp
9.5 °C
CHW supply setpoint · live
CHW supply / return
9.6 / 14.1 °C
ΔT 4.5 °C · live
CDW supply / return
33.3 / 38.4 °C
wet-bulb 29.1 °C · live
Plant loading
62%
480 of 770 TR · live
Total facility — 14 d
Transformer TR-1 — 14 d
Transformer TR-2 — 14 d
CHW plant efficiency — 14 d avg
Primary CHW supply temp — 14 d avg
Header ΔT — 14 d avg (design 6.0)
CH-1 · 375 TR — 14 d avg
CH-2 · 130 TR — 14 d avg
CH-3 · 265 TR — 14 d avg
Header chilled water ΔT — 14 d°C
Chilled water supply temperature profile — 14 d°C · vs setpoint
SupplyReturn
Condenser water temperature profile — 14 d°C · supply & return
CDW supply (to chillers)CDW return (from chillers)
Chiller loading — live% of rated TR
CH-1 375 TR
CH-2 130 TR
CH-3 265 TR
Plant 770 TR
Loading is instantaneous (chiller panel %RLA-derived). Sustained loading above 90% on the lead machine triggers the staging advisor.
Total power demand profile — 14 dkW · TR-1 + TR-2
TR-1TR-2
Total plant cooling ton-hrs profile — 14 dTR-hr
Chillers hourly running status — todayfixed · hourly
CH-1
CH-2
CH-3
RunOffTrip
Plant efficiency duration line — 14 dkW/TR sorted worst → best · % of time
Consumption carpet — 14 days × 24 hfacility kWh / hour · plant-wide
00:00
03:00
06:00
09:00
12:00
15:00
18:00
21:00
low 582 kWhhigh 1,863 kWh
Meter report — energy meters by group — 14 dkWh per interval · plant-wide
ChillersRising mainsF&B + spaCDW pumpsCT fansCHW pumps
30 meters folded into 6 groups so lines stay readable — the full per-meter register lives on Energy & cost.