Operate

Plant overview

live · 5 s refresh · 11 Jul 2026 14:58 IST
Plant kW/TR
1.10
target 0.85 · +29%
Cooling load
612 TR
44% of installed
Header ΔT
4.5 °C
design 6.0
CHW supply
9.6 °C
setpoint 9.5
Plant power
673 kW
-4% vs yesterday
Cost today
₹ 41.2k
baseline ₹ 36.8k
Plant schematic — liveclick any asset → detail
ChillerCapacityStatusLoadkW/TRCOPNote
CH-1300 TRRUN78%0.904.0normal
CH-2300 TROFFstandby
CH-3300 TRRUN71%1.502.4⚠ efficiency drift
CH-4500 TROFFstandby
SystemRunningStatusDetail
Primary CHW pumps2/5NORMALduty rotation on start
Condenser pumps2/5NORMALduty rotation on start
Cooling towers2/4AUTOfans staged on CDW leaving temp
Condenser loopNORMALin 33.3 °C → out 38.4 °C · wet-bulb 29.1 °C
Zone secondary Guest · Public · Banquet3/3ZONES FED1 of 2 pumps each, duty rotation on
Header temps — 24 h°C
Range
SupplyReturn
8.310.412.414.416.516:0004:0015:00SupplyReturn
Needs attention3
CH-3 approach temperature high₹ 6.1k/dayLow ΔT syndrome₹ 2.3k/dayCT-2 approach drifting up₹ 0.9k/day
Plant electrical power — 24 hkW · chillers + pumps + CT fans
415559.7704.5849.399416:0004:0015:00
Cost today by tariff slabToD applied live
Night off-peak 22:00–06:00 · ₹ 6.152,940 kWh · ₹ 18.1k
Normal 06:00–18:00 · ₹ 7.852,610 kWh · ₹ 20.5k
Evening peak 18:00–22:00 · ₹ 9.45280 kWh so far · ₹ 2.6k
Running equipmentlive states
Plant kW/TR is computed from panel kW fallback for CWP-4/5 — meters EM_21/EM_24 flatlined, value flagged estimated.