Chiller Plant Manager
live
PeriodAugJul · monthly grain
Energy cost MTD
₹ 12.8 L
budget ₹ 11.8 L · +8.5%
Verified savings YTD
₹ 5.1 L
-6.2% vs baseline (IPMVP)
Cost / ton-hour
₹ 16.7
brand median ₹ 14.2
CO₂ — last 12 m
2,545 tCO₂e
grid factor 0.71 kg/kWh
Money at risk
₹ 14.1k /day
open engineering findings
Savings pipeline
₹ 17.4 L /yr
5 initiatives, ₹ 5.5 L spend
Energy cost vs budget — last 12 m₹ lakh · July is month-to-date
ActualBudget
0122436AugSepOctNovDecJanFebMarAprMayJunJul
Last 12 m: ₹ 272.5 L actual vs ₹ 282.5 L budget — overrun concentrated in Apr–May (early heat wave, verified against weather-normalized baseline, not operations).
Plant efficiency — monthly average — last 12 mkW/TR · vs target
0.80.911.11.1AugFebJultarget 0.85
Every 0.1 kW/TR above target costs ≈ ₹ 7 L/yr at current load and tariffs. The Apr–Jul climb tracks the CH-3 condenser fouling — closing findings F-2607 and F-2555 recovers most of the gap.
Savings initiativeseach ₹ figure is measured, not estimated
InitiativeStatusSpendSavingPayback
CH-3 condenser descale (WO-1187)APPROVED₹ 1.2 L₹ 1.83 L/yr8 mo
Staging order fix — CH-1+CH-2 before CH-3IN PROGRESSnil (BMS logic)₹ 5.2 L/yrimmediate
Zone-2 AHU valve overhaul (low ΔT)QUOTED₹ 3.4 L₹ 8.4 L/yr5 mo
Evening-peak pre-cooling scheduleLIVE SINCE MAYnil₹ 1.96 L/yrimmediate
Replace 4 dead energy metersPO RAISED₹ 0.9 Ldata integrity
Risk register — what could cost usrolled up from engineering findings
RiskExposureOwnerState
CH-3 running degraded fouled condenser; trip risk in peak season₹ 6.1k/day + outage riskChief engineerOPEN 6 d
Low ΔT syndrome excess pumping, guest-comfort margin₹ 2.3k/dayShift engineerRECURRING
4 dead energy meters 13% of metering blind; M&V exposureaudit/report integrityO&M vendorPO RAISED
Chiller service overdue CH-3 past AMC windowwarranty postureChief engineerOVERDUE
Every line links to a priced engineering finding with an audit trail — this table is the same data, translated for a monthly owners' review.
Site benchmark — vs brand medianmore properties join in phase 3
MetricWestin SohnaBrand medianGap
Plant efficiency kW/TR1.100.85+29%
Cooling cost ₹ / ton-hour delivered16.714.2+18%
Single-property view for now — as more properties onboard, this becomes a ranked portfolio comparison and the medians switch from brand-published to measured.
Carbon — monthly emissions — last 12 mtCO₂e · IN grid factor
0112224337AugSepOctNovDecJanFebMarAprMayJunJul
Feeds the group ESG report directly (Scope 2, location-based). The savings pipeline above is worth ≈ 163 tCO₂e/yr if fully executed.
Capital plan — where the next rupee goeshealth-ranked · engineering-verified
AssetHealthIssueRecommended actionEst. costPayback
CH-3 (265 TR, 2013)Condenser fouling + 76% efficiency driftDescale now; budget compressor overhaul FY27₹ 18 L (FY27)2.1 yr
CH-1 (375 TR, 2013)Age 13 yrs; healthy but pre-EOLCondition-monitor; no spend
CDW pumps 1–3 (40 HP)34,000 h; efficiency creepImpeller/seal kit at next AMC₹ 2.1 L1.8 yr
CT-2 fill mediaApproach drifting (scaling)Fill + nozzle replacement₹ 4.6 L3.0 yr
Energy meters ×4Dead — blinding analyticsReplace immediately₹ 0.9 Ln/a
tap anywhere to keep screen awake